The roof of the school is currently being replaced. This is our first roof of 5 that will eventually be improved.
The building team are keeping the existing insulation on the flat roof. They are then adding additional insulation as part of the rebuild. The depth of insulation varies from 30mm to 150mm thickness.
It is predicted that our roof will change in performance: from 0.25 kelvins to 0.18 kelvins.
Per metre, this will save approx 1 degree celsius per hour.
Alumasc BGT PIR Insulation is being used.
Photo to be added showing roof near completion when my IT works
MSOfficePNG(12).galleryitem
Photo attached of roof being 2/3 completed.